TEC Program Description…
To help clients save on maintenance and operating costs by offering energy savings services.

TEC Mission Statement…
ATS&R is committed to providing comprehensive services related to owning and operating a building that results in energy savings and optimal performance of facilities throughout the life of a building.

TEC Team Advantage…

Pro-active Solution: Promotes efficient and cost effective facility operations and maintenance to avoid future problems

Rebate Opportunities: ENERGY STAR Rating Certification and other utility company programs can result in significant rebates for the use of energy efficient equipment

Environmentally Conscious: Reduction in Energy use

The Bottom Line: Cost savings

Indoor Environment Quality: Improved indoor air quality, improved working and learning environment

Records: Easily accessible recorded history of your energy usage monitored by a third party

Support System: TEC Team Member assigned to be a liaison for your Building & Grounds Supervisor

Equipment Understanding: The TEC program will provide valuable knowledge to maintenance staff operating equipment to assist in proper equipment function at all times.

ENERGY STAR Recgonition…

New Richmond Elementary School
New Richmond High School
(School District of New Richmond, WI)

ATS&R can now display the “Designed to Earn the ENERGY STAR” graphic for both of these schools. The design of these schools meet the estimated energy performance of the US EPA criteria. The buildings will be eligible for ENERGY STAR after maintaining superior performance for one year.




Mechanical Systems Test Answers:

1. A variable frequency drive should always run at a constant speed? False

2. Air handling unit filters typically only require replacement once a year?
False

3. Fan belts do not require tightening?
False

4. A drain pan should never have a pool of standing water in it?
False

5. Your building has a set of O&M manuals on site?
True

6. Remote critical alarms do not include building space temperature?
False

7. CO2 monitoring on gym air handling units will increase the outside air for large assemblies?
True

8. The pool air handling unit refrigeration systems needs to operate during the winter months?
True

9. Summer boiler is needed to maintain temperature and humidity levels in the building when air conditioning is operating?
True

10. During the Spring/Summer/Fall the heating pump VFD should be operating at low speed?
True